关灯
instruktsii dushevaia kabina

Dushevaia Kabina: Instruktsii

Proper preparation is the foundation of a durable installation.

: Standard operation requires water pressure between 0.2 and 0.4 MPa (approx. 2–4 atmospheres). If pressure is too high, a pressure reducer is necessary; if too low, a pump must be installed.

Following a logical sequence prevents costly errors like leaks or structural instability.

: The floor must be perfectly level and strong enough to support the weight of the cabin, the water, and the user. A clearance of at least 50 cm should be maintained on two sides for maintenance access, and 10–15 cm should remain between the cabin roof and the ceiling.

: Water supply and sewage pipes should be finalized before finishing the walls, as this often involves chasing. Use a mechanical filter (at least 100 microns ) to protect the fixtures from sediment. 2. Step-by-Step Installation Process

关注我们:QQ官方群

instruktsii dushevaia kabina

官方QQ群

instruktsii dushevaia kabina

官方微信联系

全国服务热线:

13389675138

公司地址:重庆市九龙坡区石桥铺赛博数码4楼B17号

邮编:400000 Email:183791839@qq.com

Copyright   ©2015-2016  中国数据恢复基地论坛Powered by©JQHDD!技术支持:锦强数据     ( 渝ICP备18011701号 )